Update on construction progress of low-rise residential area of Phu My Residential Area Project until 27/02/2018

In early December 2017, the company has started some houses in Block B, after the Lunar New Year will be implemented in batches continue B, C, D. At the same time, in the second quarter of 2018, the infrastructure of the remaining areas of low-rise and green parks will be completed. From Quarter 3/2018, the company will start building blocks A, E, F, L.

Here are some pictures of construction progress until 28/02/2018:
1. Execution of the project fence: front 15B and D17:

HÀNG RÀO MẶT ĐƯỜNG LỚN 15B (1)CỔNG CHÍNH ĐƯỜNG 15BHÀNG RÀO MẶT ĐƯỜNG LỚN 15BHÀNG RÀO MẶT SAU (ĐƯỜNG 17) (2)

2. Under construction on the second floor of B02:

CĂN B02 (1)CĂN B02 (3)CĂN B2B02 3

3. Finished all the rough floor 2, up to the third floor base B11:

CĂN B11 (2) CĂN B11 (1)